Project Overview

The project involved upgrading the water systems and plumbing fixtures at two labour camps located in Sonapur and Jebel Ali, Dubai, serving approximately 1,400 residents in total.

The scope covered water treatment systems as well as improvements to water consumption across the camps. Existing taps, toilets, bidets and water systems serving the bathrooms, washrooms and kitchens were upgraded with water-saving solutions.

The aim was to improve water quality while reducing unnecessary water consumption throughout both facilities.

Water Treatment Systems

Water treatment systems were provided to improve the quality of the incoming water supply and support the daily requirements of the two labour camps.

The treatment solutions were considered according to the requirements of each location and the intended water usage.

Water-Saving Fixture Upgrades

Alongside the water treatment works, existing plumbing fixtures and water systems were upgraded to help reduce water consumption across the camps.

The work included:

  • Replacement of existing basin taps with push-type, self-closing water-saving taps
  • Installation of bidets
  • Replacement of existing toilets with water-efficient units
  • Upgrading bathroom and washroom water systems with water-saving fixtures
  • Improvements to kitchen water systems to reduce unnecessary water use
  • Installation of water-saving plumbing accessories and fittings

These upgrades were carried out across both labour camps to improve water efficiency in areas with regular daily usage.

Project Locations

The project covered two separate labour camp locations:

Sonapur Labour Camp

Water treatment and water-saving plumbing upgrades to support the daily requirements of the residents.

Jebel Ali Labour Camp

Water treatment and water-saving fixture upgrades covering the camp's bathrooms, washrooms, toilets and kitchen facilities.

Project Outcome

The project brought together water treatment and water conservation measures across two labour camps serving approximately 1,400 people.

By upgrading existing plumbing fixtures and introducing water-saving systems, the works helped improve water-use efficiency while supporting the camps' daily water requirements.